01
Custom homes, additions & ADUs · El Dorado County
Custom Homes, Additions & ADUs
Ground-up custom homes, room additions, detached ADUs, and garage conversions across El Dorado County and the Highway 50 corridor, built by a Placerville-based general contractor licensed since 2004.
- CA License #835432
- Bonded & Fully Insured
- EPA Lead-Safe Certified
- Since 2004
ADU types
ADU types we build
Detached, garage conversion, or attached. Each format in one line.
02
Garage conversion
03
Attached ADU & JADU
The permit path
The El Dorado County permit path
The desks an El Dorado County ADU application crosses. CCI manages permitting and inspections end to end.
- 01
Design & engineering
Site plan, floor plan, structural calcs.
- 02
Building Services plan check
County review of the full permit set.
- 03
Environmental Management
Septic/OWTS capacity review where applicable.
- 04
Fire district / WUI review
Fire-severity and access review where applicable.
- 05
Permit issuance
Fees paid, permit in hand, work begins.
- 06
Inspections to final
County inspections through final sign-off.
Straight answer on cost
What an ADU costs to build in El Dorado County
The honest answer is a range set by your site, not the floor plan. Slope, septic, and utility runs price a foothill lot differently than Sacramento flatland.
Detached ADU, all-in
By estimate
Range from real El Dorado County estimates
- Site work on slope
- Engineered foundations, grading, retaining. The hillside line item.
- Utilities & septic
- Service runs, panel capacity, and county septic scope.
- Finish level
- Interior selections move the top of the range, not the bottom.
Ready to price your ADU?
An estimate on your actual lot, with your slope, your septic, and your utility run, from a Placerville-based GC licensed since 2004.
CSLB #835432 · Bonded · Fully insured · Quick response during business hours
El Dorado County ADU questions, answered first
Every answer leads with the answer, then the code cites that back it up.